×

deterministic scheduling meaning in Chinese

确定性调度

Examples

  1. The former is characterized by the ability to know requirements with surety in advance , thereby making deterministic scheduling possible
    前者的特征是确保具有提前了解需求的能力,因而可以制订确定性计划。
  2. According to the number of processors , scheduling problem can be grouped as single - machine scheduling problem and multi - machine scheduling problem . according to whether the job ' s processing time , released time and the surroundings of the processors are deterministic or stochastic , scheduling problem can be grouped as deterministic scheduling problem and stochastic scheduling problem . according to whether the parameters of the jobs are given before - hand , scheduling problem can be grouped as static scheduling problem and dynamic scheduling problem
    按处理机个数将排序问题分为:单机排序问题和多处理机排序问题;根据任务加工时间和到达时间以及处理机的工作环境等数据是确定的或服从某种随机分布可分为:确定性排序问题和随机排序问题;根据所有任务的参数是否是预先给定的可分为:静态排序问题和动态排序问题。

Related Words

  1. deterministic
  2. deterministic system
  3. deterministic coefficient
  4. deterministic diagram
  5. deterministic trend
  6. deterministic automation
  7. deterministic schedule
  8. deterministic modeling
  9. deterministic approach
  10. deterministic distribution
  11. deterministic sampling
  12. deterministic schedule
  13. deterministic semantics
  14. deterministic signal
PC Version

Copyright © 2018 WordTech Co.